Current hysteresis band (A)— Hysteresis band 1(default) | positive number
Hysteresis band,h, for the current controller. The switch-on point ish/2 and the switch-off point is -h/2.
Sample time (-1 for inherited)— Block sample time -1(default) | positive scalar
Time, in s, between consecutive block executions. During execution, the block produces outputs and, if appropriate, updates its internal state. For more information, seeWhat Is Sample Time?andSpecify Sample Time.
If this block is inside a triggered subsystem, inherit the sample time by setting this parameter to-1. If this block is in a continuous variable-step model, specify the sample time explicitly using a positive scalar.
You can also select a web site from the following list:
How to Get Best Site Performance
Select the China site (in Chinese or English) for best site performance. Other MathWorks country sites are not optimized for visits from your location.